Welcome to CDC Stacks | Gob And Gate Road Reaction To Longwall Mining In Bump-Prone Strata - 10148 | National Institute for Occupational Safety and Health
Stacks Logo
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.
 
 
Help
Clear All Simple Search
Advanced Search
Gob And Gate Road Reaction To Longwall Mining In Bump-Prone Strata
  • Published Date:
    1/1/2010
Filetype[PDF - 2.01 MB]


Details:
  • Description:
    The U.S. Bureau of Mines conducted research to characterize longwall gob loading under bump-prone geologic conditions. Bureau-designed stress meters were installed in the floor rock beneath two longwall panels and coal pillars in the gate road between them. Gob and gate road pillar stress was monitored continuously by a state-of-the-art data acquisition system. The timing of the final destruction of the abutment pillar's load-bearing core was optimal, since the pillar is located between two gob areas and no longer of significant importance for ground control. Maximum stress was observed immediately in front of the longwall face, and this pressure quickly dropped as the face moved past the instruments. The center of the longwall panels regained significant overburden load, while the instruments located less than 100 ft from the edge of the panel showed little or no increase in pressure due to gob reloading.

  • Supporting Files:
    No Additional Files