Causes and control of coal mine bumps
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

Filetype[PDF-21.94 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Description:
      "Coal mine bumps involve the violent, rapid failure of coal and rock around a mine excavation. Deep coal mines with strong roof and floor rocks and high-stress conditions frequently experience face and rib bumps. The bump problem is becoming more severe as mining depth increases, prompting efforts to control high stress in advance of mining. This Bureau of Mines report presents a review of the most widely used methods to detect and destress high-stress zones along coal faces and an investigation of stress-related bump problems and destressing techniques at a cooperating mine. Geotechnical instrumentation and microseismic methods were used to better understand bump occurrences in underground coal mines. Laboratory tests of the drilling-yield method for high-stress detection were conducted to determine the correlation between the volume of cuttings obtained and the magnitude of the applied stress at various confining pressures. A three-dimensional, multiple-seam computer modeling program, mulsim, was used to evalaute the effectiveness of stress-relief methods. Modeling results indicate that dangerously high-stress areas can be controlled by either proper planning or destressing. Proper mine planning guidelines and destressing methods such as volley firing, hydraulic fracturing, and auger drilling are discussed." - NIOSHTIC-2

      NIOSHTIC no. 10006586

    • Document Type:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at stacks.cdc.gov