Drilling a horizontal coalbed methane drainage system from a directional surface borehole
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

CDC STACKS serves as an archival repository of CDC-published products including scientific findings, journal articles, guidelines, recommendations, or other public health information authored or co-authored by CDC or funded partners. As a repository, CDC STACKS retains documents in their original published format to ensure public access to scientific information.
i

Drilling a horizontal coalbed methane drainage system from a directional surface borehole

Filetype[PDF-6.20 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
English

Details:

  • Personal Author:
  • Corporate Authors:
  • Description:
    "Three long horizontal holes were drilled from a directionally drilled surface hole at the Emerald Mine near Waynesburg, Pennsylvania. The purpose was to adapt the technique of directional drilling for use in draining methane from coalbeds. A 504-m (1,652-ft) long, 76-mm (3-in) diameter, circular arc pilot hole was drilled, using a downhole mud motor, to enter the Pittsburgh coalbed at a vertical depth of 350 m (1,000 ft). The hole was reamed to 222 mm (8-3/4 in) and was cased to a measured depth of 486 m (1,595 ft). Three 76-mm (3-in) diameter horizontal drainage holes were then drilled, totaling 2,909 m (9,544 ft) of horizontal hole. Improvements in drilling methods increased the average drilling rate from 20.4 M (67 ft) to 64.9 M (213 ft) per day. The cost of drilling the directional and horizontal holes (using a government-owned drill rig) was $1,169,530, a figure inflated by inexperience and by delays caused by lost-circulation problems and fishing operations. An estimated total drilling cost of $960,000 (including rental of a drill rig) for an improved system, was determined by a detailed cost analysis. Initial gas and water production from November 1979 through May 1980 was low because of caving of the horizontal holes drilled in shale near the bottom of the casing." - NIOSHTIC-2

    NIOSHTIC no. 10002321

  • Subjects:
  • Series:
  • Subseries:
  • Document Type:
  • Genre:
  • Pages in Document:
    ii, 50 numbered pages
  • NIOSHTIC Number:
    10002321
  • Resource Number:
    RI-8640
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at stacks.cdc.gov