Drilling a horizontal coalbed methane drainage system from a directional surface borehole
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Drilling a horizontal coalbed methane drainage system from a directional surface borehole

Filetype[PDF-6.20 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Description:
      "Three long horizontal holes were drilled from a directionally drilled surface hole at the Emerald Mine near Waynesburg, Pennsylvania. The purpose was to adapt the technique of directional drilling for use in draining methane from coalbeds. A 504-m (1,652-ft) long, 76-mm (3-in) diameter, circular arc pilot hole was drilled, using a downhole mud motor, to enter the Pittsburgh coalbed at a vertical depth of 350 m (1,000 ft). The hole was reamed to 222 mm (8-3/4 in) and was cased to a measured depth of 486 m (1,595 ft). Three 76-mm (3-in) diameter horizontal drainage holes were then drilled, totaling 2,909 m (9,544 ft) of horizontal hole. Improvements in drilling methods increased the average drilling rate from 20.4 M (67 ft) to 64.9 M (213 ft) per day. The cost of drilling the directional and horizontal holes (using a government-owned drill rig) was $1,169,530, a figure inflated by inexperience and by delays caused by lost-circulation problems and fishing operations. An estimated total drilling cost of $960,000 (including rental of a drill rig) for an improved system, was determined by a detailed cost analysis. Initial gas and water production from November 1979 through May 1980 was low because of caving of the horizontal holes drilled in shale near the bottom of the casing." - NIOSHTIC-2

      NIOSHTIC no. 10002321

    • Document Type:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at stacks.cdc.gov