Welcome to CDC stacks | Degasification And Production Of Natural Gas From An Air Shaft In The Pittsburgh Coalbed - 9251 | National Institute for Occupational Safety and Health
Stacks Logo
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.
 
 
Help
Clear All Simple Search
Advanced Search
Degasification And Production Of Natural Gas From An Air Shaft In The Pittsburgh Coalbed
  • Published Date:
    1/1/1976
Filetype[PDF-1.27 MB]


Details:
  • Description:
    The Bureau of Mines conducted research to determine the effectiveness of long holes drilled in solid virgin coal in degasifying an area of the Pitts- burgh coalbed showing that horizontal holes drilled into a virgin coalbed from the bottom of any shaft will effectively remove methane gas in commercial quantities from the Pittsburgh coalbed. The in situ pressure at a depth of 214 feet into the coalbed and the average gas and water flows from the five degasification holes were 3 lb/in2 gage and 860,000 ft3/d and 1.7 gal/min, respectively. On June 19, 1975, after 593 days of degasification, a compressor was installed and pipeline quality gas was introduced into a commercial pipeline. As of June 1, 1976, after 1,022 days of degasification, over 753 million cubic feet of gas had been drained and 117 million cubic feet of gas had been purchased by the gas company for use in the local community of Wadestown, W. Va. The gas drained to date is six times the gas estimated to be in the area subtended by the holes. Methane emissions at the working face of 1 West mains, Federal No. 2 mine has been reduced by 50 pct, proving the value of methane drainage by horizontal degasification holes drilled from shaft bottoms ahead of mining.

  • Supporting Files:
    No Additional Files
No Related Documents.
You May Also Like: