Computer Simulations Help Determine Safe Vertical Boom Speeds For Roof Bolting In Underground Coal Mines
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

CDC STACKS serves as an archival repository of CDC-published products including scientific findings, journal articles, guidelines, recommendations, or other public health information authored or co-authored by CDC or funded partners. As a repository, CDC STACKS retains documents in their original published format to ensure public access to scientific information.
i

Computer Simulations Help Determine Safe Vertical Boom Speeds For Roof Bolting In Underground Coal Mines

Filetype[PDF-6.79 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed

Details:

  • Personal Author:
  • Description:
    Problem: Incident investigation reports do not usually contain enough information to aid in studying boom arm vertical speed for roof bolting machines to determine the impact that appendage speed had on an operator's risk of experiencing a contact. Laboratory experiments with human subjects are also not feasible because of safety and ethical issues. Method Researchers successfully developed a three-dimensional computer model that uses virtual human simulation software as the primary means to gather contact data when the boom arm touches the operator's hand, arm, head, or leg. Results: Data analysis of roof bolter simulations shows that the speed of the boom arm is the most important factor in determining the risk of an operator making contact. Regardless of other variables, contact incidents were always greater when the bolter arm was moving up, greater on the hand, and greater for the boom arm part of the machine. The reason why the subject experiences more contacts when the boom arm is moving up rather than down is that more risky behaviors occur during drilling and bolting when the boom arm is ascending. Based on the data collected, boom speeds greater than 13 in/sec result in a substantial increase in risk to the roof bolter operator of making contact. Speeds less than or equal to 13 in/sec are associated with a more modest relative risk of making contact, which represents a decrease in potential hazard. Impact on Industry: The use of such information can be quite helpful in making recommendations to machine design and task procedures to reduce the likelihood that roof bolter operators will experience injury due to contact with a moving roof bolting machine's boom arm.
  • Subjects:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at stacks.cdc.gov