The Relationship Between Pre-Construction Decision-Making and the Effectiveness of Risk Control: Testing the Time-Safety Influence Curve
-
2015/01/19
Details
-
Personal Author:
-
Description:Purpose: The purpose of this paper is to explore the relationship between the timing with which decisions are made about how to control work health and safety (WHS) risks in construction project (i.e. either pre- or post-construction) and the quality of risk control outcomes. Design/methodology/approach: Data were collected from 23 construction projects in Australia and the USA. Totally, 43 features of work were identified for analysis and decision making in relation to these features of work was mapped across the life of the projects. The quality of risk control outcomes was assessed using a classification system based on the "hierarchy of control". Within this hierarchy, technological forms of control are preferable to behavioural forms of controls. Findings: The results indicate that risk control outcomes were significantly better in the Australian compared with the US cases. The results also reveal a significant relationship between the quality of risk controls and the timing of risk control selection decisions. The greater the proportion of risk controls selected during the pre-construction stages of a project, the better the risk control outcomes. Research limitations/implications: The results provide preliminary evidence that technological risk controls are more likely to be implemented if WHS risks are considered and controls are selected in the planning and design stages of construction projects. Practical implications: The research highlights the need for WHS risk to be integrated into decision making early in the life of construction projects. Originality/value: Previous research has linked accidents to design. However, the retrospective nature of these studies has not permitted an analysis of the effectiveness of integrating WHS into pre-construction decision making. Prospective studies have been lacking. This research provides empirical evidence in support of the relationship between early consideration of WHS and risk control effectiveness. [Description provided by NIOSH]
-
Subjects:
-
Keywords:
-
ISSN:0969-9988
-
Document Type:
-
Funding:
-
Genre:
-
Place as Subject:
-
CIO:
-
Topic:
-
Location:
-
Pages in Document:108-124
-
Volume:22
-
Issue:1
-
NIOSHTIC Number:nn:20061982
-
Citation:Eng Constr Archit Manage 2015 Jan; 22(1):108-124
-
Email:helen.lingard@rmit.edu.au
-
Federal Fiscal Year:2015
-
Performing Organization:Virginia Polytechnic Institute and State University
-
Peer Reviewed:True
-
Start Date:20090901
-
Source Full Name:Engineering, Construction and Architectural Management
-
End Date:20150131
-
Collection(s):
-
Main Document Checksum:urn:sha-512:0476e613372ef182354dc2998d9568dd5282d413a265f2b28af241f0764b18c2113cd97a7630e9f54a1041cbf2e9b86d4510387f0b89bfe5a6fca2e0f2fd4af8
-
Download URL:
-
File Type:
ON THIS PAGE
CDC STACKS serves as an archival repository of CDC-published products including
scientific findings,
journal articles, guidelines, recommendations, or other public health information authored or
co-authored by CDC or funded partners.
As a repository, CDC STACKS retains documents in their original published format to ensure public access to scientific information.
As a repository, CDC STACKS retains documents in their original published format to ensure public access to scientific information.
You May Also Like