Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

Filetype[PDF-1.22 MB]


  • English

  • Details:

    • Description:
      This experience is valuable because the closure of the CDFs provided unique examples of large-scale clean up due to chemical agent contamination. The major phases of the closure process were planning, decommissioning and decontamination, clearance, and post-clearance.

      During the planning phase, potentially contaminated areas were identified. After identification of these areas, risk assessments were developed along with plans and procedures for decommissioning, decontamination, and verification of decontamination.

      Decommissioning activities included de-energizing equipment and performing gross decontamination. After gross decontamination, equipment and items were removed that could not be decontaminated efficiently or effectively. Remediation of spaces where chemical agent could be trapped was critical to decontamination. Without identification and remediation of these spaces, residual agent contamination could remain despite the rigor of decontamination efforts.

      For clearance after complete decontamination of a facility, unventilated air monitoring testing was used to determine the presence of any residual low-level chemical agent vapor emissions. To conduct unventilated air monitoring testing of an area, the area was sealed and isolated from a facility’s ventilation system. This testing was performed on a room by room or area basis rather than by testing an entire facility.

      For post-clearance once all of a facility’s unventilated monitoring tests were completed, a formal decision process was used to determine whether the process was successful. Once deemed successful, engineering controls for agent hazards were no longer required and the facility ventilation system could be shut down. The buildings were opened to the atmosphere and prepared for demolition.

      decontam-clearance_u.s._army_cdfs_508.pdf

    • Document Type:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at stacks.cdc.gov