Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Well-point containment of impoundment leakage

Filetype[PDF-1.34 MB]


  • English

  • Details:

    • Personal Author:
    • Description:
      "Research was conducted to evaluate the effectiveness of a well- point dewatering system in conjunction with a French drain to intercept waste impoundment leakage while reducing the volume of waste water requiring treatment. A well-point dewatering system composed of 585 production wells was installed around the perimeter of a leaking impoundment that previously used only a French-drain system for leakage control. The placement of the well-point system was designed to intercept and remove the leakage from the groundwater before the contaminant reached the French drain. Groundwater monitoring at this site revealed that after a period of approximately 40 days the well-point dewatering system had stabilized and effectively prevented the further spread of contamination to the French drain." - NIOSHTIC-2

      NIOSH no. 10012063

    • Subjects:
    • Document Type:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at stacks.cdc.gov